We are still in the process of cleaning up the offices and parking lot of all the mud and water, the drywall has been cut up to 2 feet up from the floors and new insulation is being installed. Arturo and I were able to get into the canal and clean out the flow door of roots and debree that were jammed inside it and remove the mud in the bottom of the canal that prevented it from opening. We depend on this to get the water off our property and has not been functional since march of 2008. We have repeatedly asked, begged, requested that the City get a crew out to clean it out so we would not suffer flooding. they completely neglected the requests. Now you can see the results.
Propane heaters to dry out walls
Drowned computer and hard drive. Also drowned an Apple G4 and Apple 15 inch laptop & Apple laser printer.
We lost 4 strobe power packs to water damage.
One of the problem drains the City refused to clean.
This really stinks and is polluted. This is after we cleaned it as much as we could stand.
The canal after water has drained from the canal 9 days after the flood.
Flood in front of building















